Home    Photo Gallery
Project Overview
Construction Projects
- Overview
- Underway
- I-95/I-695 Interchange & Lillian Holt Drive and Kenwood Avenue Bridges
- I-95 from Rossville Blvd. to Campbell Blvd.
- I-95 from Chesaco Ave. to Hazelwood Ave.
- I-95 and I-895 Mainline Construction
- Completed
- Rossville Boulevard Bridge Replacement
- Cowenton Avenue and Joppa Road Bridge Replacements
- I-95/I-895 Northbound General-Purpose Lanes Construction
- Environmental Stewardship
   
Driver Information
Residents
Press Releases / Brochures
Frequently Asked Questions
Stay Informed
Contractors
 
  Contact Us
 

I-95 ETLs Project Office
8019 Corporate Drive, Suite F
White Marsh, Maryland 21236
Phone 410-931-0808
Toll-free 1-888-I95-ETLS
Fax 410-931-4110

Comment Online


Local Traveler Information

For more information about the Authority visit: www.mdtransportationauthority.com

   
Construction Projects  
 
I-95/I-695 Interchange & Lillian Holt Drive and Kenwood Avenue Bridges

The I-95/I-695 interchange, located in Baltimore County, will be totally reconstructed in multiple phases. The project area extends along I-95 from the Kenwood Avenue overpass to south of the Rossville Boulevard overpass, and along I-695 from west of the Lillian Holt Drive overpass to the I-695/Philadelphia Road (MD Route 7) interchange.

The new interchange is necessary in order to realign the existing travel (general-purpose) lanes and to add the new Express Toll LanesSM (ETLsSM) along I-95. During the first phase of construction, a new, reconfigured four-level interchange for general-purpose roadways and ramps is being constructed. Also, as part of the first phase of construction, the Kenwood Avenue and Lillian Holt Drive replacement overpass bridges have been completed.

Phase II of the contract will start by spring 2012 and will include the construction of two mainline bridges.

Printer friendly fact sheet PDF

View the project photo gallery.

The project area after completion of Phase I.

Bridge Highlights
  • A new four-level general-purpose lane interchange.
  • New overpass bridges for Kenwood Avenue and Lillian Holt Drive.


About Construction

Phase I construction will extend 1.3 miles along I-95. The 3½ year project began in January 2007 and is expected to be completed in 2010. Construction work includes:

  • New Stormwater Management Facilities.
  • Signing, Marking and Interim Intelligent Transportation System (ITS) Improvements.
  • Pavement Milling and Resurfacing.
  • Excavation and Embankments.
  • Full-Depth Pavement Construction.
  • New Storm Drain Improvements.
  • New Retaining Wall Structures.
  • New Sound Barrier Structures.
  • New Bridge Structures.
  • Utility Relocation.
  • Stream Relocation.
  • Landscaping.
  • Lighting.